• About
  • Approach
  • Sectors
  • QODA LIGHT
  • QODA Sustainability
  • Project Profiles
  • News
  • Careers
  • Contact
QODA Logo
Home >News

Categories

  • All
  • Design
  • Marketing
  • People
  • Projects
  • Sustainable
  • Technical

Archive

  • All
  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
  • 2013
  • 2012

BS7671: 2008, The IET Wiring Regulations

1 July 2015

The Third Amendment to BS7671:2008, the IET Wiring regulations became effective on the 1st January 2015. From this date there is a six month transition period before the 1st July 2015 when all installations must be designed to comply with the new regulations. The Amendment introduces a number of changes throughout the regulations and a useful guide.

More information
TAGS: Technical

Taking BIM to the next level

Blog

1 July 2015

QODA has long been advocates for BIM and the benefits it brings to construction. The opportunities for coordination and clash detection are generally accepted as are the benefits of scheduling cost management. These are all tasks that are aimed to make our life easier – “proper design”, minimal change and efficient construction. Whilst clients want to see less risk and lower construction costs, delivered through these efficiencies, they also want to see the finished product before signing off on a huge budget – wouldn’t you? We all like to try before we buy! So Virtual Real...

More information
TAGS: Technical

NBS Create

14 May 2015

Keeping specifications up to date is a time consuming but essential task. With our recent investment in NBS create this will no longer be an issue. With regular online updates, simple specification writing tools and BIM capability, it is set to transform the way we work.

More information
TAGS: Technical

Unintended consequences

Blog

10 May 2015

Following a recent briefing meeting held with the local engineering team from SEE Plc we have a better understanding of the limitations placed on connecting renewable generation schemes to the existing electricity network. A recent scheme at Rose Hill Community Centre has been limited to 49kW (rather than the 62kWp planned) due to network equipment issues at the main Cowley substation. It appears this is becoming an increasingly prevalent problem around the country as the antiquated National Grid was never designed for the power flows caused by the proliferation of micro generation. ...

More information
TAGS: Technical
  • Prev
  • 1
  • 2
  • 3
  • 4
  • Next

QODA Consulting Norwich

Suite 1.11 St Georges Works, 51 Colegate, Norwich, NR3 1DD

Call us on: 01603 364590
Email: enquiries@qodaconsulting.com

QODA Consulting Cambridge

95 Regent Street, Cambridge, CB2 1AW

Call us on: 01223 650880
Email: enquiries@qodaconsulting.com

QODA Consulting London

81-87 High Holborn, London, WC1V 6DF

Call us on: 020 7394 2125
Email: enquiries@qodaconsulting.com

QODA Consulting Oxfordshire

1 Ram Court, Wicklesham Lodge, Faringdon, Oxfordshire, SN7 7PN

Call us on: 01367 245960
Email: enquiries@qodaconsulting.com

Keep up to date

Twitter Twitter LinkedIn LinkedIn Instagram Instagram

© 2025 QODA
Cookie Policy  |  Privacy Policy