
Renewable Generation Schemes
4 May 2015
Following a recent briefing meeting held with the local engineering team from SEE Plc we have a better understanding of the limitations placed on connecting renewable generation schemes to the existing electricity network. A recent scheme at Rose Hill Community Centre has been limited to 49kW (rather than the 62kWp planned) due to network equipment issues at the main Cowley substation. It appears this is becoming an increasingly prevalent problem around the country as the antiquated National Grid was never designed for the power flows caused by the proliferation of micro generation...
Building For The Future

12 May 2014
At a recent event for the new Leigh UTC in Dartford, Kent Lord Baker said: "How you have managed to do this for quite a modest sum I don’t know. This is really dramatic. It really is a wonderful building". QODA provided mechanical , electrical and sustainability services for the project. Leigh is part of a national programme of University Technical Colleges (UTC’s) that are ‘building for the future of technological education’ for students from 14 to 19 years old.
QODA London Opens
28 April 2014
In response to the needs of our clients and with over 30% of our business in the Capital, we are delighted to announce the opening of our new office in Central London. Contact Details
Matthew Voaden Joins As Director
7 April 2014
We are pleased to welcome Matthew who will lead the development of the London office. He brings with him extensive experience of commercial, mixed-use residential and hotel sectors. More Details